Advertisement

Advertise here

D11 Bond Passes — What $775 Million in School Renovations Means for Colorado Springs Families

By Sarah Morales, Staff Reporter · COS Parenting
Published
Share

Colorado Springs School District 11 voters approved Ballot Issue 4A on November 3 — a $775 million bond measure that will fund the most significant school renovation push D11 has seen in more than 20 years.

The measure passed with approximately 51.68% of the vote. It wasn't a runaway, but it was enough. After more than two decades without a successful bond, D11 now has the funding authority to begin transforming some of the oldest school buildings in central and east Colorado Springs.

Advertisement

Advertise here

Where the Money Goes

The $775 million will be distributed across the district, with the largest individual allocations going to the schools with the greatest renovation needs:

  • Palmer High School: $150 million. Palmer is one of D11's oldest and most storied campuses. The renovation is expected to be one of the largest public school projects in Colorado Springs history.
  • Holmes Middle School: $80 million. Holmes serves a large portion of central Colorado Springs and has had significant deferred maintenance for years.
  • Air conditioning upgrades across the district. Most D11 schools don't have air conditioning — a persistent issue as Colorado Springs summers have grown hotter. The bond allocates funding to bring AC to campuses district-wide.
  • Safety and security upgrades at all campuses. This includes secured entry points, updated camera systems, and infrastructure improvements tied to the district's safety plan.

Smaller allocations for other campuses, general maintenance, and technology infrastructure are also included in the bond, though Palmer and Holmes represent the flagship projects.

Why This Vote Was So Significant

D11's last successful bond measure passed in the early 2000s. In the more than two decades since, the district has relied on a combination of state funding, grants, and deferred maintenance to keep its buildings operational — an approach that's left a growing backlog of infrastructure needs.

D11 serves approximately 23,000 students across central and eastern Colorado Springs. Many of its school buildings were constructed in the mid-20th century and haven't received major renovation funding in a generation.

The 51.68% approval margin also signals something about where the community stands. Bonds typically require a majority to pass in Colorado, and D11's history of failures at the ballot made the slim margin a meaningful win rather than a disappointment.

When Will Families See Changes?

Not immediately. Bond funding involves design, permitting, procurement, and phased construction — a multi-year process even after the money is authorized. Construction on major projects is expected to begin in 2027, with Palmer High and Holmes Middle likely among the first to break ground given their priority designation and funding levels.

Air conditioning upgrades at smaller campuses may move faster, as they're less architecturally complex and can often be implemented building-by-building over a shorter timeline.

Quick Reference: D11 Bond Measure

DetailInfo
Ballot Issue4A
Election dateNovember 3, 2026
Bond amount$775 million
ResultPassed — approximately 51.68% yes
Last successful D11 bondEarly 2000s (20+ years ago)
Palmer High allocation$150 million
Holmes Middle allocation$80 million
District enrollmentApproximately 23,000 students
Construction expected to start2027

What's Next

D11 will now move into the planning and design phase for bond projects. The district is expected to hold community input sessions before finalizing renovation plans for major campuses like Palmer and Holmes — information about those sessions will come through D11's official communications channels at d11.org.

If you have kids in D11, it's worth watching for updates from your school's principal and from the district's bond project page as planning gets underway. These projects will unfold over several years, but the approval is the foundation everything else builds on.

Sources

  1. Colorado Springs School District 11 (d11.org)

What locals are saying

Be the first to share your thoughts

Start the conversation about this article.

Leave a reply

More from Colorado Springs